Login
Remember Me
Construction Snap Shots - October 2012

The stairwell is up through the 2nd floor.

     

The entrance to the stairs.


Third floor elevator lobby area.

     

Replacing the floor


Third floor framing.

     

More framing.

 
check out   continue shopping